
Foreword
Beijing-Shanghai high-speed railway put to use in 2011,as the railway of the highest standard,largest scale and longest one-stage completion in the world,is the largest project in infrastructure construction since the foundation of People’s Republic of China.Beijing-Shanghai high-speed railway is a grand transport channel penetrating eastern developed regions,running through four provinces and three cities like Bejing,Hebei,Tianjin,Shandong,Jiangsu,Anhui and Shanghai,and connecting circum-Bohai-Sea Economic Belt and Yangtze River Delta Economic Belt.The total length of the Beijing-Shanghai high-speed railway is 1318km,on which CRTSⅠ and CRTSⅡ slab ballastless track(1200km)were laid(double line).
This book falls into eight chapters,the CRTSⅠ slab ballastless track construction technology is introduced and explained detailedly as per working procedure,which includes structure design of ballastless track,track slab prefabrication,construction for base plate and convex blocking mound,track slab laying and fine adjustment,emulsified asphalt mortar pouring,and convex blocking mound resin construction,and the key points are emphatically explained like labor organization,technology and process equipment and quality control,etc.The technical standard,design and construction method,and quality control measures mentioned in the book are gradually innovated,enriched and improved in the construction of Beijing-Shanghai high-speed railway,valuable experiences are also referred to and learned from other passenger dedicated railways either constructed or under construction,therefore,represent the highest level of CRTSⅠslab ballastless construction technology so far.
The chief editor of this book is Li Changning,associate editors are Dai Yu and Zhong Haijiang,and other participants in writing this book include Chang Yawen,Sun Junhong,Wang Feng,Chen Jianqiang,Xu Hong,Hou Xiaojun and Bai Yangjun.We appreciate the guidance and strong support of Guo Fu’an,Wang Qingbo who are from the Engineering Management Center of China Railway,Zhao Guotang,Yang Qibing,Wei Qiang,Wei Laigui and Kong Wenya who are from Beijing-Shanghai High-speed Railway Corporation,and Wang Shusen who are from Huatie Engineering Consulting Co.,Ltd.,during the writing process,we also got the support from the Third Railway Survey and Design Institute Group Corporation,China Railway SIYUAN Survey and Design Group Co.,Ltd.and China Railway No.2 Group Co.,Ltd.,many thanks to them all.
It must be noted that ballastless track was not laid on the long span steel girder of Jinan Yellow River Super Large Bridge and Nanjing Dashengguan Bridge due to technical reasons,which is somewhat pity.Nevertheless,the ballastless track technology is in the ascendant in China,its design,construction and technical standard are being developed and progressed in engineering practice,we have sound reasons to believe that Chinese scientific and research personnel,and engineering and technical staff are capable of solving this worldwide problem in the future and contribute more to ballastless track technology of high-speed railway.
There may still be some omissions and mistakes in this book,so valuable comments and suggestions from all readers are welcome for us to modify,supplement and improve in later edition.