
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
5.5 Installation of Disk Feeder
General Items
5.5.1 The allowable deviation for installation of disk feeder shall be in accordance with those specified in Table 5.5.1.
Inspection quantity:exhaustive check.
Inspection method:see Table 5.5.1.
Table 5.5.1 Allowable deviation for installation of disk feeder
