6.11 Head Bending Rail and Intermediate Rail
Ⅰ Dominant Item
6.11.1 Preset thermal expansion gap for rail joints must meet requirements of design technical document.
Check quantity:to check all.
Inspection method:to check installation.
Ⅱ General Item
6.11.2 Installation for head bending rail shall take chain blade of head wheel as reference;tolerance for installation of the bending rail shall meet requirements in Table 6.11.2,see Figure 6.11.2.
Check quantity:to check all.
Inspection method:see Table 6.11.2.
Table 6.11.2 Tolerance for installation of head bending rail
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_14.jpg?sign=1738952831-jRddU4XG4Ekk2MkcG3wqYVGs22iDnO8t-0-2ab01c3e958a2b857912cd442663f59e)
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_15.jpg?sign=1738952831-zWoI98XuTcMlEG4Lf5FWyNn3Hyjia33Z-0-1963e408d0965397d68092864091f356)
Figure 6.11.2 Head bending rail
1-Chain wheel;2-Head bending rail;3-Longitudinal centerline of sintering equipment
6.11.3 Tolerance for intermediate rail shall meet requirements in Table 6.11.3.
Check quantity:to check all.
Inspection method:see Table 6.11.3.
Table 6.11.3 Tolerance for installation of intermediate rail
![img](https://epubservercos.yuewen.com/7ECCA0/18000635208206206/epubprivate/OEBPS/Images/txt006_16.jpg?sign=1738952831-Hi4I36eTQjOGZ7oVYOpNykCz6NHgHFtg-0-118bd3d63d334232ac80290048b62441)