![DL/T5210.4-2009电力建设施工质量验收及评价规程第4部分:热工仪表及控制装置(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/49/33689049/b_33689049.jpg)
4.6 Installation of Control Panel(Console,Box and Cabinet)
4.6.1 Quantity for acceptance inspection.
1 Control panel(console,box and cabinet)installed in rows shall be inspected 100%.
2 Control panel(console,box and cabinet)installed separately shall be inspected 30% randomly.
3 Other installation items shall be inspected 20% randomly.
4.6.2 Installation of control panel.
1 Manufacture and installation inspection and acceptance of control panel(console,box and cabinet)and equipment base are detailed in Table 4.6.2-1.
Table 4.6.2-1 Manufacture and installation of control panel(console,box and cabinet)and equipment base
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_180.jpg?sign=1739264385-hEvCiNwxMG8U0B0uwqLXD4oVz3lvamN6-0-49123e65889a825f686014d6c4da4be5)
Table 4.6.2-1(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_181.jpg?sign=1739264385-AfV0TDEceC5BUm469KZPVk6QzMCn55KW-0-50d6804520afff0a3f81963e41bbed8c)
2 Installation inspection and acceptance of control panel(console,box and cabinet)and in rows are detailed in Table 4.6.2-2.
Table 4.6.2-2 Installation of control panel(console,box and cabinet)in rows
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_182.jpg?sign=1739264385-cOAPypvlS7s3gghGqkTnxoLghsLY15oF-0-12dbdd01b747e6894ca9eb302ec5780d)
3 Installation inspection and acceptance of individual panel(console,box and cabinet)are detailed in Table 4.6.2-3.
Table 4.6.2-3 Installation of individual panel(console,box and cabinet)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_183.jpg?sign=1739264385-tKDD6mjWQooiGElADky586cKLCmnpCW9-0-bda6f89136c85d1cd88e3016d414b48f)
4 Installation inspection and acceptance of thermostat,protective box and connection box are detailed in Table 4.6.2-4.
Table 4.6.2-4 Installation of thermostat,protective box and connection box
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_184.jpg?sign=1739264385-kBzmp4y4xIoKDgdaTyUN32KlHbtQcS4A-0-3feb03be06711e0c01fbb0e04361a49c)
Table 4.6.2-4(Continued)
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_185.jpg?sign=1739264385-yJvqknVsWyIWXFxISX5eVEfYXfxyJOkv-0-4a1fad0e353f474efb1074a2d0fc4455)
4.6.3 Installation of instruments on panel.
1 Installation inspection and acceptance of instrument on panel are detailed in Table 4.6.3-1.
Table 4.6.3-1 Installation of instruments on panel
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_186.jpg?sign=1739264385-gKTsDpegqoPJV4Bv1nWUHdvrlZacRlxW-0-ffd798bed0660987822dce567124becc)
2 Installation inspection and acceptance of distributed control system are detailed in Table 4.6.3-2.
Table 4.6.3-2 installation of distributed control system
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_187.jpg?sign=1739264385-SqlJ39loAGNgvxEQfPGOS7WhcFyPMtX3-0-736730c437c1ee457fa345f2842b61e6)
3 Installation inspection and acceptance of digital display instrument are detailed in Table 4.6.3-3.
Table 4.6.3-3 Installation of digital display instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_188.jpg?sign=1739264385-t2xOM2979p0i0UxB2TASiuyC0u6nZEOg-0-e992d6aadcc2a5beeea4b57da5869a25)
4 Installation inspection and acceptance of recording instrument are detailed in Table 4.6.3-4.
Table 4.6.3-4 Installation of recording instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_189.jpg?sign=1739264385-YeyVIZqZMZ9Jr0PS0sGtDa1y6sxETVUV-0-3d7111be789a9ada35feb5acd253f992)
5 Inspection and acceptance of survey instrument are detailed in Table 4.6.3-5.
Table 4.6.3-5 Survey instrument
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_190.jpg?sign=1739264385-gYRizCY6583JIwoT5ja3QDWoySTzy8OP-0-f837bf6adf31016c323dd4b01bed1b26)
6 Installation inspection and acceptance of flashing-signal alarm devices and large screen display are detailed in Table 4.6.3-6.
Table 4.6.3-6 Installation of flashing-signal alarm devices and large screen display
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_191.jpg?sign=1739264385-XjcscefRHT00fwuFcGq7SfIAuxsaf1gI-0-769fc7df8be1008c14146d609f69b30b)
7 Installation inspection and acceptance of the control system for PLC are detailed in Table 4.6.3-7.
Table 4.6.3-7 Installation of the control system for PLC
![img](https://epubservercos.yuewen.com/DCA083/18000637808217306/epubprivate/OEBPS/Images/txt004_192.jpg?sign=1739264385-BReyxUvgNOL7Ljsg2GUI87GKI3I8RX6U-0-09b311e8ae33aec71fd159a6bbe90ce3)