9.2 Installation of Collecting Plates of Wet Quenching Tower
9.2.1 The installation of collecting plates shall be in compliance with the following requirements:
1 The space between collecting plates is adjusted,and allowable deviation shall be±5.0mm;
2 The elevation of collecting plates is adjusted,and allowable deviation shall be±10.0mm;
3 The center of collecting plates is adjusted,and allowable deviation shall be 10.0mm.